» Tips for Remodeling your Home

Remodeling Your Home - not that bad.

Should I move out?

The first important thing to consider is will remain in your home or move out for the duration of the project. If your project involves any substantial remodeling of existing spaces, I urge you to move to temporary quarters. What do I mean by substantial? Well if it is anything more than painting or floor coverings, the work is substantial. Work that involves moving walls, reworking electrical, plumbing or mechanical systems can make your home unlivable. Rent the movie ďThe Money PitĒ and see what I mean. On the other hand, if you are having an addition to your home, you may be able to remain and not be overly affected by the work. You should discuss your options with your architect/designer early on in the project.

If you are going to vacate, then move all your belongings out of the areas of work to a secure location. With the contractor in full control of your property, you donít want things to disappear. You also may realize some savings since the contractor will know his workflow will be uninterrupted.

Permits

A building permit is generally required whenever structural work is involved or when the basic living area of a home is to be changed. To be sure, check your local requirements. If your contract does not provide that the contractor will obtain the permits and he doesn't, you may be held legally responsible.

Do not get any permit yourself. If you do, you will be considered to be the contractor, and you could be held liable if the work does not comply with the building codes.

Notice to Proceed

Prior to starting work, you should issue a formal "Notice to Proceed". This will serve to document the official start date for the project and will define the agreed completion date. This is important for several reasons. First the dates of start and completion are clearly spelled out. Second, many states have time limitations on when Liens can be filed based on those dates. Third, it lets the contractor know you will be monitoring his progress. You donít want to have to be asking the contractor when he will be done and his answer every time is "two weeks".

Schedule of Values

Most standard construction contracts require the contractor to furnish you with a Schedule of Values. The Schedule of Values is a detailed statement furnished by the contractor, builder or others outlining the portions of the contract sum. It allocates values for the various parts of the work and is also used as the basis for submitting and reviewing progress payments.

The schedule will be broken down by the major steps in the project making it easy to monitor the progress of the job as well as validate applications for payment. For example, the schedule of values allows $2000 for interior doors. The contractor submits a payment application that includes $2000 for interior doors. If the inspection shows all the interior doors are in place, the contractor is entitled to full payment for the interior doors. If the inspection shows half the interior doors are in place, the contractor is only entitled to 50% or $1000 on the current payment application.

Monitor progress daily

During the course of the work, it is important you visit the work area on a daily basis. The best time is after working hours. This way you can see if the contractor is proceeding in a timely manner. This daily monitoring can alert you early on to potential problems the contractor may have being able to man the job or pay for materials.

Take photos

There is no better way to document progress and problems than by taking photos and lots of them. I suggest you buy a digital camera if you donít have one and use it every time you visit the site.

Payments

First, on the subject of down payments, my advice to you is making a down payment weakens your position. A qualified contractor should have sufficient resources to fund the construction of the job without advances.

The frequency of progress payment should be defined in the contract usually weekly, bi-weekly or monthly. When the contractor submits his application for payment, the site should be visited and the application verified against the actual work performed. Here is another instance when having an architect on your team pays many times over. An architect will visit the site, verify the work in place and provide you with a written report. He will also certify the application for payment. With this paperwork in hand you can feel confident the contractor is not being paid for work in advance. On a personal note, the very first job I monitored early in my career the contractor submitted a payment application with a huge advance he said was for materials he had ordered. I refused to certify the payment. We later found out he was trying to scrape together enough money to pay for his Colorado deer hunting trip the next week!

Retainage

Retainage is another issue to be considered during the contract negotiations and is an important safeguard for you as owner. I recommend 10% be withheld from every payment application. Your architect can advise you on this. The purpose of retainage is simply to keep the contractor interested in finishing the project. There is an old saying in construction that ďthe last 5% of a job is the hardest to completeĒ. By the time your project is 95% complete, the contractor has likely started another job. His attention is naturally focused on the job that will make him the most money for that current month. Having an extra 10% keeps him interested in completing your job.

The final payment including retainage is normally not approved until all work has been inspected, all paperwork is turned in and any requirements of local building officials have been completed. Protect yourself

Once the work begins, if your contractor will have to use subcontractors, you should protect yourself from liens against your home in the event the primary contractor doesn't pay the subcontractors or suppliers. You can do this by insisting upon a lien release from all subcontractors and suppliers before you pay for any work. Or, you can use the services of a construction control company. For a small percentage of your contract price, you may deposit your payments with them and they will disburse the funds and secure the lien releases for you. Although they are not required to inspect the work, they generally do.

Inspections

Inspections will occur throughout the project. There will be local required inspections performed by the local building officials. Additional inspections will be performed to certify payment applications and to monitor the progress of the work.

Change Orders

Even with the best plans and specifications, sometimes hidden conditions will be uncovered that will require a change order. These conditions can range from problems with the soils on your site to uncovered substandard construction that must be brought into compliance with current codes. For too many contractors, this is where they plan to make their money by bidding low to get the job and then hitting you with a flurry of inflated change orders. Your architect will assist you in validating any change orders negotiating a true and fair cost.

Also be aware, if you decide to make changes during the course of the work because you donít like something or want a different material, you will receive a change order and the price will be much higher than if you made the change during the planning stage. Again, proper planning will eliminate or minimize these costly change orders. It is not unusual for a poorly planned project to double in price during construction.

 

Articles By Category
 
Charlotte Contractors
Pools & Spas
Remodeling
Lighting and Electrical
Roofing
Home Improvement Projects
Flooring
Painting
Lawn and Garden
Custom Home Builders
Land Development
Concrete Driveway
Raleigh Contractors
Exterior Construction
D.I.Y.
Windows and Doors
Bathroom
General Contractor
Basement
Kitchen
 
 

Copyright (2008) Improvementtree, A division of Random Opportunities, LLC. All rights reserved.
Find Raleigh Contractors | Find Charlotte Contractors | Privacy Policy | Terms of service | Post Home Improvement Project |
Submit Home Improvement Articles
Improvement Tree is a FREE contractors directory that allows home owners and property owners to find qualified, local general contractors in the fields of plumbing, electrical, flooring, painting, roofing, concrete, landscaping, commercial, and more. Home owners and property owners can also post home improvement projects for free and have those same contractors safely, securely, and privately bid on their project so they can get the home improvement project done for the best price.